Boker Long Lead EDC

Boker Long Lead EDC
RRP:
NZ$ 89.00
Price:
NZ$ 49.00
 

or four payments of $12.25 with
Afterpay Payment Offer Learn More

Purchase Qty:
 
 

The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife, which has proven itself a million times over thanks to its ease of use and fewer components. The satin-finished blade made of 8Cr13MoV stainless steel is flat-ground, is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r).

  • Pocket Knife
  • 18,4 cm
  • 8 cm
  • 2,7 mm
  • 78 g
  • 8Cr13MoV
  • G10
  • Nail Nick
  • Manual
  • Slipjoint
  • Asia
  • Black
  • Uncoated
  • 01SC080